Saturday, March 31, 2007

Construction #21

Two days before launch!

From Eric: Well, it's finally down to the wire. seaDee launches on Monday morning! You can be sure that I will be there to record the event for posterity (and for your Blog).

The boat is coming along just beautifully.

The stripes and bottom paint are applied. Blue and Tan.





The speaker system in the salon is made by Orb. Softball sized drivers and a subwoofer hidden under the seating. Icom 802 SSB for long distance communications





The SSB requires a good RF ground. Four 5/16" bronze bolts fasten a ground plate to the hull and provide a connection point inside the hull for copper strap. The strap is routed to the tuner.





More photos on Monday.

Friday, March 23, 2007

Construction #20

When I was informed recently the boat would done and in the water by April, it seemed an ambitious plan. After all, the original delivery date was August 2006 and month after month slipped by with little progress. But now I'm a believer. New photos:

Flybridge, and radar arch which will be added to the boat once delivered to Green Cove Springs.







Master stateroom







Second stateroom will have a elevated twin with two sets of drawers



More soon.

Tuesday, March 20, 2007

Construction #19

Can you feel the completion momentum? New photos show:

Vanity top in the head





Major engine room progress





Washer/Dryer installed



Rub rail and rails are present

Thursday, March 15, 2007

Construction #18

Photos just in from Eric show progress in the galley and master stateroom.





The Helm



Rails and steps to the flybridge have been installed

Sunday, March 11, 2007

Construction #17

Construction on seaDee continues. Completion is now estimated to be 4 weeks. In the water in April. Final decisions on furniture, electronics, fabrics, counter tops and lighting have been made and we are in the final finishing stage.

Helm wiring:



Furniture in the master stateroom:



Finishing work in the salon:

Friday, February 16, 2007

Construction #16


Home stretch. Tom's Gale Force is now in the water and seaDee, plus two other boats are now scheduled for a late March completion date. Gale Force is a N47 (ten feet longer than seaDee). Eric has sent several new photos of seaDee's engine room and it's very exciting to see the major systems take shape.

Speaking of photos. For some unknown reason, all of the photos from past posts have suddenly disappeared. I have a note into Blogger, but to date, no reply. If the problem can't be fixed I may have to delete the early posts. Bummer.

Also, note a new feature of the updated Blogger. Labels. On the right, posts are now grouped by a label. For example, all posts related to the great loop can be isolated and viewed together. Sweet.



Saturday, January 27, 2007

I snapped some more photos while visiting Mirage



While in Gainesville recently to visit Eric, Ken and the staff at Mirage, I snapped a few photos of seaDee in the finishing area. The area is jammed with boats. Two N47s are now in the final stages. Tom's boat will be finished for the winter boat shows. Christina Sea is right along side and will be finished a few weeks after seaDee (they hope).